INFRASTRUCTURE DEVELOPMENT WORKS OF SECTOR 24-B, 25-B, 18-C, 19-C & 4-C AT SCHEME-33, GULZAR-E-HIJRI, KARACHI.
About Project
The ASCO Infrastructure Development Project at Scheme-33, Gulzar-e-Hijri, Karachi encompasses comprehensive development works across Sectors 24-B, 25-B, 18-C, 19-C, and 4-C. The scope includes the construction of road networks, sewerage systems, water supply lines, stormwater drainage, and electrification works, ensuring robust and sustainable urban infrastructure.

Significant progress has been achieved across all sectors. Key components such as road carpeting, drainage systems, and main water pipelines in Sectors 24-B and 25-B are largely completed and operational. Development in Sectors 18-C, 19-C, and 4-C is currently underway, with earthworks, base preparation, and pipeline laying actively progressing. The project is being executed with adherence to quality standards and timelines, contributing to the long-term urban expansion and infrastructure resilience of the area.


